How design-build can prevent construction delays

Delays can be a hassle in everyday life. You could be on your way to work when traffic causes you to run behind. You may have to wait on your food longer than expected at a restaurant. An unexpected flat tire could create downtime on a road trip. But when it comes to construction, delays can be costly and prevent you from reaching your target open date.

For the experts at Leon Williams Contractors, it is our goal to keep your project on track by reducing delays in the field. As the Maryville commercial construction expert, we utilize the design-build project delivery method to ensure you don’t spend more money because of delays.

The Design-Build Institute of America describes design-build as “where one entity, the design-builder, enters into a single contract with the owner to provide both design and construction services.” With this method, the roles of the designer and constructor are integrated to ensure one entity drives one unified workflow from initial concept through completion. This creates a collaborative team effort between the design-build team and the owner while placing responsibility for coordinating all project elements on the design-build team.

Here are some ways design-build can prevent construction delays on your project.

Accountability

As mentioned, the sole purpose of the design-build method is to have the design and construction services integrated, which places the responsibility solely on the design-build team. This typically results in fewer change orders and disputes because all the work is performed under the same umbrella. Project leaders on the design-build team can hold individuals accountable for their portion of the project and reduce the number of errors that could ultimately cause delays. In addition, the owner knows who to approach in the event of an error or change.

Enhanced Teamwork

With the team being united from the onset of the project, they are aware of what the project entails. This makes it easier for team members to remain on the same page and stick to the agreed-on schedule. Communication is a major component of a project. The design-build method empowers team members to create a collaborative atmosphere with everyone working together to complete a project faster and more effectively as compared to traditional delivery methods.

Simplicity

The design-build method simplifies the building process thanks to collaborative teamwork. Not only does this reduce delivery time, but it also results in fewer delays, lower costs, and less paperwork. All of this contributes to a much timelier completion date.

 If you are interested in learning how our design-build services can reduce delays, or if you are ready to start your next project, give our experts a call at (865) 982-1734. You can also contact us online.